S.E/S.W 31st Street Phase II begins east of CR 475A (S.W. 27th Avenue) and ends at US 441.

The section of this project from CR 475A to S.W. 7th Avenue will widen the existing two lanes to a four lane divided section with median, curb, and gutter. The travel lanes will be 12 feet wide with a four feet wide bike lane in each direction. There will also be a five feet wide sidewalk on both sides of the roadway. Stormwater will be routed to a stormwater ponding system. This roadway will start by connecting to the existing widened section beside Trinity Catholic High School.

The section of this project from S.W. 7th Avenue to US 441 will be a new four lane divided section with median, curb, and gutter. It will also have 12 feet travel lanes with four feet wide bike lanes and a five feet wide sidewalk on each side. This section will tie into and match the pavement at the intersection of US 441 where a prior S.E. 31st Street Project ended.


                                                  View Typical Roadway Section (.pdf)

This project is being funded jointly by Marion County, the City of Ocala, and the Florida Department of Transportation.
The Engineer of Record is Juan Guerra of Guerra Development Corporation.
The total contract amount is $11,395,267.60 and the construction contractor is Anderson Columbia Co., Inc.


Project Information Schedule

Roadway Section

Construction Photos Links Contacts

Download free Adobe Acrobat Reader 6.0 to view PDF content within this site

Contact us: Email

 

Hit Counter

 

Copyright © 2004 Marion County, Florida
Any questions, comments or suggestions
about this site can be sent to the
Marion County Webmaster