The stormwater management system along the Marion County road network
requires constant care to maintain an acceptable level of service for
water quality and quantity control. Routine mowing
occurs on road right-of-ways and drainage retention areas (DRAs). In
addition, the Road Division addresses routine repairs such as erosion,
minor structure damage, and sinkhole repairs. There are times, however,
when a higher degree of maintenance work is required.
Compiled below are several projects initiated by the Stormwater
Division to address large scale maintenance projects, as well
as, known water quality and drainage issues.
The Pipe and Swale Restoration projects begin with a
comprehensive investigation of the condition of swales and associated
pipes along County-maintained roads. Work includes cleaning of clogged
pipes, grading of swales and replacement of crushed pipes to ensure
proper runoff flow. End treatments are constructed for pipes that do not
have a mitered concrete end-section to protect them from future damage.
Other Major Maintenance work involves the removal of
tree and vegetative debris, clearing, grubbing, grading, fence repair,
and soil stabilization in overgrown DRAs. The goal of this work is to
restore the DRAs to their original, constructed condition and
functionality.
|
Project
|
Area
(Click on text for a map of
project location)
|
Date Completed |
Cost |
|
Routine DRA Mowing
|
|
|
|
|
S RFP 07P-025
|
County-wide.
|
FY 2006-2007
FY 2007-2008
FY 2008-2009
FY 2009-2010 |
$ 309,372
$ 467,131
$ 516,248
$ 430,408
|
|
Pipe and Swale Restoration
|
|
|
|
|
S Bid 04B-005
|
Eureka & Ft. McCoy and Various SE Marion County areas.
|
FY 2003-2004 |
$ 294,830
|
|
S Bid 05B-076
|
Rainbow Springs area
|
FY 2005-2006 |
$ 414,641
|
|
S Bid 06B-109
|
Carol & Country Estates/Subdivisions
|
FY 2006-2007 |
$ 355,540
|
|
S Bid 09B-091
|
Arterial Roads/County-wide
|
FY 2009-2010 |
$ 183,560
|
|
S Bid 10B-026
|
Collector Roads/Phase 1
|
FY 2009-2010 |
$ 235,691
|
|
|
|
|
|
|
Major Maintenance
|
|
|
|
|
Tree & Vegetative Debris Removal
|
|
|
|
|
S PO 0700569
|
Silver Springs Shores DRAs
|
FY 2006-2007 |
$ 11,475
|
|
S Bid 07B-033
|
Marion Oaks DRAs
|
FY 2006-2007 |
$ 14,500
|
|
S Bid 07B-054
|
Southeast & Southwest Quadrants - Marion County DRAs
|
FY 2006-2007 |
$ 11,000
|
|
S Bid 08B-013
|
Southwest Quadrant - Marion County DRAs
|
FY 2007-2008 |
$ 8,250
|
|
S Quote Q08-029
|
Cedar Hills
|
FY 2007-2008 |
$ 5,499
|
|
S Bid 08B-032
|
Highway 484 DRA
|
|
$ 4,235
|
|
|
|
|
|
|
Major Vegetable Debris Removal
|
|
|
|
|
S Bid 06B-051
|
Fore Acres
|
FY 2005-2006 |
$ 31,512
|
|
S Bid 07B-066
|
10 DRAs throughout Marion County
|
FY 2006-2007 |
$ 87,678
|
|
S Bid 08B-014
|
19 DRAs throughout Marion County
|
FY 2007-2008 |
$ 100,375
|
|
S Bid 08B-086
|
37 DRAs throughout Marion County
|
FY 2008-2009 |
$ 208,773
|
|
S Bid 09B-039
|
4 DRAs throughout Marion County
|
FY 2008-2009 |
$ 17,050 |
|
S Bid 10B-027
|
27 DRAs throughout Marion County
|
FY 2009-2010 |
$ 113,850 |
|
|
|
|
|
|